Exterior trim and siding 90%
Interior trim and flooring Remodel 75%
ADA Ramp finished except handrail
Side entry finished except tile
Drywall in addition and remodel finished for phase 1
Sprinkler system finished
Plumbing 75%
Electric 75%
HVAC 75%
All roofing finished
Flooring selected 98% Phase I
Plumbing selected 98%Phase I
Lighting selected 98% Phase I
Majority of paint selections finalized
FIRST OF ALL - A CHAPTER ROOM!!!!!
FLOORING: (From left to right) The downstairs powder room w/ ceramic tile, the TV room shown here prepping for hardwoods, the kitchen hall/entry w/ brick pavers to hold up well under heavy traffic, and hardwoods going in the back entry foyer.
RAMP: No more decking to maintain! Here's the new access ramp that opens into the chapter room.